Iberdrola performance

Iberdrola will build its next wind farm in Spain, the Herrera Complex, with the most powerful onshore wind turbine, after awarding Siemens Gamesa the contract to supply the first SG 4.5-145 wind turbines, with a 4.5 MW power unit; which is almost seven times more powerful than the first wind turbines installed in Spain more than two decades ago.

Iberdrola, Quality At A Price

Iberdrola’s stock had a good performance this year despite the difficult conditions faced by the group in two of its main markets (the UK and Spain). The negative effect was mainly on the generation and supply side as earnings in this segment decreased by 32%: the UK’s earnings contracted by 75% and the Spanish by 19%. As pointed by Carax- Alphavalue “this was due to lower plant operations (load factor) with contracting margins added to low hydro production and higher transmission costs