REE permits renewables

red electrica cableado

The Amount Of Renewables With Access Permission To REE Shows Spanish Network Is Starting To Be Saturated

Renta 4 | Withdrawals from network access points are continuing. To the over 20 GW of renewable projects abandoned in September, we must now add another almost 5 GW during the month of October. As of October 31st 2020, the number of renewables’ plans with access permits has risen to 121.7 GW. This means only a further 0.5 GW have obtained the access point, a clear sign the transport network is fairly saturated.